All of the cuts have been made at this point. Here are some photos from the construction:Here glue is being applied to the PVC piping.
These are the semi finished frame pieces.
This is the assembled frame for the ROV frame.
This is the assembled frame with mechanical arm attached to it.
This is the frame of the craft after its first paint job. This is the completed fram floating upside down in the pool with the mechanical arm attached to it holding a wiffle ball.