Thursday, March 27, 2008
Construction
All of the cuts have been made at this point. Here are some photos from the construction:
Here glue is being applied to the PVC piping
.
These are the semi finished frame pieces.
This is the assembled frame for the ROV frame.
This is the assembled frame with mechanical arm attached to it.
This is the frame of the craft after its first paint job.
T
his is the completed fram floating upside down in the pool with the mechanical arm attached to it holding a wiffle ball.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Contributors
EV
MAST Technology: Design & Problem Solving
Blog Archive
▼
2008
(7)
►
June
(1)
►
May
(2)
▼
March
(2)
Finsished Product
Construction
►
February
(1)
►
January
(1)
►
2007
(21)
►
December
(4)
►
November
(1)
►
October
(8)
►
September
(8)
Labels
Alternative Solutions
Backgound Information
Calandar
Calender
Completed Model
Construction
Design Brief
Expanded Isometric
Isometric
Limitations
Math and Science Report
MP3 Calendar
Orthographic Drawings
Plan of Procedures
Research
Selection/ Rejection
Self Evaluation
Specifications
Testing Procedures
Testing Results
Links
AOL
Yahoo
Google
MAST
No comments:
Post a Comment