September
19. Work on calendar and post on webblog
20. Calendar due, revise brainstorming
21. Complete brainstorming
24. Touch up alternative solutions
25. Continue and complete alternative solutions
26. Begin testing procedures
27. Complete testing procedures, have posted: alternative solutions, brainstorming, and testing procedure
28. Begin selection/ rejection report
October
1. Discuss with group members selection/ rejection
2. Make a selection from the alternative solutions
3. Informal progress update, brainstorming, alternative solutions, testing procedures, & outline
4. Collect ideas for the materials to be used in the model
5. Begin to gather materials for the model
8. Finish collection of materials for model
9. Begin the assembly of the model
10-19. Continue work on the model
22. Finish major model parts
23. Touch up small areas of model
24. Have model entirely finished
25. Begin developmental work
26. Continue developmental work
29. Prepare for presentations
30. Final preparation for presentations
31. Model, selection/ rejection due
November
1. Formal Presentations
2-13. Getting ahead on second marking period work
Subscribe to:
Post Comments (Atom)
9 comments:
As of Thursday the calender is up to date. The calender has been posted as well as revisions to brainstorming, background information, and research.
As of Tuesday all tasks are up to date.
Testing procedures have been popsted. Alternative solutions have been completed, however they still need to be scanned and posted. Everything besides this is up to date.
The alternate solutions have been posted. After the presentations a selection/ rejection report will be generated.
The informal presentation has been completed. The selection/ rejection report is being composed, and model ideas will be generated as soon as a selection has been made.
A selection has been made for the craft design and the report will be posted within the next several days. A selection for the controls is still being worked on.
UPDATE for 10/19:
Posted selection rejection report on blog.
Work on the model has begun and the frame is almost completely assembled.
Post a Comment